January 20 2018

The guys battled the elements and finished the Palma garage. Concrete and garage door will have to wait for the thaw!

February 11 2019

Got the tile guy going at the Williams residence, plumbers finishing the Church residence, starting demo at the Buist job and if there’s time I can get over to the Howard job and finish up the trim.  I’m enjoying this winter slowdown......😂

February 1 2019
Photos from Moulenbelt Construction LLC

Photos from Moulenbelt Construction LLC's post

The Howard bath remodel is coming along! We removed and replaced the old shower, re-framed the bulkhead above for a small cedar cabinet storage area, removed The linen closet and door adjacent to the shower to create a laundry area for a stackable...  

January 22 2019
Photos from Moulenbelt Construction LLC

Photos from Moulenbelt Construction LLC's post

What a difference a morning makes! Plumber comes tomorrow and then I hope I can remember how it goes back together! 🤷‍♂️

January 15 2019

Doing some pre bid design work this am. It’s probly time for this old dog to learn some new tricks.....

January 12 2019
Photos from Moulenbelt Construction LLC

Photos from Moulenbelt Construction LLC's post

New basement bath for the Jaworski‘s! It’s not quite done as they are handling the painting and the shower door but my work here is done! Removed the old fiberglass shower, installed a new walk in tile shower, Tile flooring, rain head and hand held...  

December 25 2018
Photos from Moulenbelt Construction LLC

Photos from Moulenbelt Construction LLC's post

Photos are starting to come in from some new 51 Bravo knife owners! 🙂

December 11 2018
Photos from Moulenbelt Construction LLC

Photos from Moulenbelt Construction LLC's post

Last garage for 2018 is in the books!

December 1 2018
Photos from Moulenbelt Construction LLC

Photos from Moulenbelt Construction LLC's post

The Williams gazebo/three seasons room is still moving along! This week Jehu Palma got the stone on the block walls. Doesn’t it look great?!

November 29 2018

So who hates dealing with hooking up and hauling trailers in the winter? 🖐🖐🖐🖐🖐

November 21 2018

OK: I have the plumbers starting the next bathroom remodel, exterior trim going on the three season porch/gazebo project, Interior trim being installed in the garage/breezeway project and the detached garage project is now ready for the electrician....